Assembly

Assembly starts on ready foundation with all the outlets of technical networks in place. If not agreed differently, usual assembling service from Husvik includes erection of the house shell finished with wooden siding from outside and sealed from inside. The house is water tight from outside and ready for installation of technical networks and internal finishing. An average size private house assembling usually takes up to 10 work days. 

Back